Production lines
Six stations, in the order a piece passes through them.
Numbered because this is the real sequence. Each station has its own checkpoint in the QC process below.
01 · Mould shopMould making
CNC-cut foam and printed masters, silicone and fibreglass moulds. 380+ moulds in storage, each tagged to a customer and model.
02 · CastingGFRC spray-up and premix casting
Face coat, then fibre-loaded backing coats. Batch weights and fibre content logged per cast.
03 · CuringCuring racks
Polymer-cured for 5–7 days in a humidity-controlled hall. No wet curing, no shrinkage cracks.
04 · FinishingGrinding, honing, sanding
Wet grinding stations, hand finishing on edges. Surface checked against the approved sample under daylight lamps.
05 · Sealing & assemblySealing and base fitting
Two coats of penetrating sealer, outdoor system on request. Steel and oak bases fitted and levelled.
06 · Packing & loadingExport packing
Foam, corner guards, pallets or crates, container loading at our own dock with a photographed loading plan.